Thursday, May 24, 2007
Adventures in Plumbing
I'm so sorry that it has been a while since I posted. I kept telling myself I was doing it and I guess well I wasn't. This past two weeks have been quite a crazy time in our bathroom life. Tyler redid all the 80 year old sewage lines from our upstairs bathroom before he would do the new ones in the basement under the old ones. Well he worked really really hard on it but there were some bumps along the way. At one point we did not have anything but the kitchen sink and that was the way it almost stayed for one night. At least Tyler was able to get the bathtub drain working because that was all we had that night and a very pregnant woman needs something. Well all that is finished with the sewage line because then we were days without a washing machine and to get thru it you have to walk thru the wall studs. To say the least, I can barely fit but we are making it work and hopefully getting done. We know that my mom is coming on the 6th and hope to have so kind of bathroom there or at least something kinda clean and not dusty.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment